Mostrar el registro sencillo del ítem

dc.contributor.advisorBravo Aguilar, Carlos Alberto
dc.contributor.authorSierra Lopinta, Haret Gonzalo
dc.date.accessioned2021-08-19T20:48:20Z
dc.date.available2021-08-19T20:48:20Z
dc.date.issued2021
dc.identifier.urihttps://hdl.handle.net/20.500.12996/4866
dc.descriptionUniversidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícola. Departamento Académico de Ordenamiento Territorial y Construcciónes_PE
dc.description.abstractEn el presente trabajo de investigación se ha aplicado las herramientas de la metodología Modelado de la Información para la Construcción (BIM, por sus siglas en inglés) a un proyecto de infraestructura hidráulica con fines de riego, en una etapa de elaboración del proyecto de obra. La investigación se centra de forma práctica en identificar los beneficios resultantes de realizar un modelado BIM, coordinación 3D y la generación de entregables a partir de los modelos tomando como caso práctico un proyecto real ubicado en el distrito de Acocro, provincia de Huamanga, departamento de Ayacucho. En primer lugar, se construyó los modelos digitales, a un Nivel de Desarrollo 350 (LOD, por sus siglas en ingles), en los softwares Revit y Civil 3D tomando como referencia los documentos del expediente técnico. Como siguiente paso se realizó la coordinación de los modelos, con el fin de identificar las posibles incidencias (incongruencias entre planos, falta de detalle/especificaciones, falta de documentación, propuestas de cambio, entre otras). Para el análisis de estas incidencias se elaboraron fichas de valoración considerando dos escenarios: el primer escenario consistió en plantear las soluciones en el caso de detectar estos errores, en una etapa de diseño aplicando BIM y el segundo consistió en plantear las soluciones en una etapa de ejecución, en caso de trabajar con una metodología tradicional. Ambas soluciones se valoraron y compararon respecto a sus costos de materiales y mano de obra, resultando un potencial beneficio en caso de utilizar herramientas BIM. Finalmente se procedió a realizar una simulación constructiva y la generación de la documentación BIM (planos y metrados) a partir del modelo coordinado, del cual se pudo observar una mejora notable en la calidad de los entregables del proyecto.es_PE
dc.description.abstractIn this research work, the tools of the BIM methodology have been applied to a project of hydraulic infrastructure for irrigation, in a phase of elaboration of the work project. The research focuses in a practical way on identifying the benefits resulting from the realization of a BIM model, the 3D coordination and the generation of deliverables from the models, taking as a practical case a real project located in the Acocro district, Huamanga province, Ayacucho department. First, the digital models were built, at a Level of Development 350, in Revit and Civil 3D software, taking as reference the documents of the technical file. As a next step, the models were coordinated in order to identify incidents (inconsistencies between plans, lack of detail / specifications, lack of documentation, change proposals, among others). For the analysis of these incidents, evaluation sheets were prepared considering two scenarios: the first scenario consisted of proposing the solutions in the case of detecting these errors, in a design stage applying BIM and the second consisted of proposing the solutions in a execution stage, in case of working with a traditional methodology. Both solutions were evaluated and compared with respect to their costs of materials and labor, resulting in a potential benefit in case of using BIM tools. Finally, the BIM documentation (plans and metrics) and a construction simulation of the coordinated model were generated, from which a notable improvement in the quality of the project deliverables could be observed.en_US
dc.formatapplication/pdfen_US
dc.language.isospaes_PE
dc.publisherUniversidad Nacional Agraria La Molinaes_PE
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectRiegoes_PE
dc.subjectCanaleses_PE
dc.subjectConstrucciones hidráulicases_PE
dc.subjectProyectos de desarrolloes_PE
dc.subjectAnálisis económicoes_PE
dc.subjectEvaluaciónes_PE
dc.subjectModelado de informaciónes_PE
dc.subjectMetodología BIMes_PE
dc.titleMetodología BIM en la elaboración de proyectos de obras hidráulicas. Caso práctico: diseño del Sistema de Riego Tarwiyocces_PE
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
thesis.degree.disciplineIngeniería Agrícolaes_PE
thesis.degree.grantorUniversidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícolaes_PE
thesis.degree.nameIngeniero Agrícolaes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.03es_PE
renati.author.dni73108965es_PE
dc.publisher.countryPEes_PE
dc.type.versioninfo:eu-repo/semantics/publishedVersionen_US
renati.advisor.orcidhttps://orcid.org/0000-0002-8282-5078es_PE
renati.advisor.dni08187832es_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.discipline811096es_PE
renati.jurorCerna Vásquez, Alfonso
renati.jurorVelásquez Bejarano, Teresa Olinda
renati.jurorEnciso Gutiérrez, Antonio Celestino


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess