Mostrar el registro sencillo del ítem
Planeamiento del proceso de purga del embalse Tablachaca en base al pronóstico de lluvia realizado para el año 2018
dc.contributor.advisor | Obregón Párraga, Esaúl | |
dc.contributor.author | Guevara Cotera, Karen Elizabeth | |
dc.date.accessioned | 2021-12-10T23:03:08Z | |
dc.date.available | 2021-12-10T23:03:08Z | |
dc.date.issued | 2021 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12996/5107 | |
dc.description | Universidad Nacional Agraria La Molina. Facultad de Ciencias. Departamento Académico de Ingeniería Ambiental, Física y Meteorología | es_PE |
dc.description.abstract | La empresa ELECTROPERU S.A. se encarga de generar energía y de este modo abastecer la demanda de energía eléctrica a gran parte del territorio nacional. Para el desarrollo de su actividad principal cuenta con estructuras hidráulicas operativas, por esta razón existe un plan de actividades de mantenimiento de sus estructuras, donde la principal es el proceso de purga de su embalse debido a la acumulación de sedimentos que ocurre de manera natural, la cual reduce la capacidad de almacenamiento útil para el recurso. En el presente trabajo se realizó la evaluación de resultados del proceso de purga para los años, 2017 y 2018. Para el año 2017, llevado a cabo de forma convencional y sin pronóstico de lluvias; mientras que para el año 2018 se tomó en cuenta el pronóstico de lluvias obteniéndose una mayor recuperación de la capacidad de almacenamiento con respecto al año 2017. Finalmente, al evaluar los resultados del proceso llevado a cabo en el año 2018, se encontró mayor eficiencia respecto al proceso del año 2017, pues el pronóstico de lluvias permitió que los caudales se mantengan durante los días de la programación, que se cumpliera con el Programa de purga anual y, por ende, que se lograra una mayor recuperación de volumen útil del embalse. Durante este año se logró recuperar un volumen útil de 5,9 MMC mientras que en el año 2017 solo 5,32 MMC. Asimismo, el rendimiento de la empresa no solo se ve reflejado en la generación de energía, pues al disminuir los sedimentos del embalse hay menos probabilidad que estos puedan llegar a las turbinas, ocasionando daños y acortando la vida útil de estas. | es_PE |
dc.description.abstract | ELECTROPERU S.A. Co. is in charge of generating energy and, therefore, supplying the demand for electricity to a large part of the national territory. For the development of its main activity, it has operational hydraulic structures. For this reason, there is a plan of maintenance activities for its structures, where the main one is the purge process of its reservoir due to the accumulation of sediments which occurs naturally and reduces the useful storage capacity for the resource. In the present assignment, the evaluation of the results of the purge process for the years 2017 and 2018 was carried out. By the year 2017, the process was carried out in a conventional way and without rain forecast, while in 2018, the rain forecast was taken into account, obtaining a greater recovery of storage capacity compared to 2017. Finally, when evaluating the results of the process carried out in 2018, greater efficiency was found compared to the process of 2017, since the rain forecast allowed the flows to be maintained during the days of the programming, the purge annual program and, therefore, a greater recovery of the useful volume of the reservoir will be achieved. During this year, a useful volume of 5,9 MMC was recovered, while in 2017 only 5,32 MMC. Likewise, the performance of the company is not only reflected in the generation of energy, but also reducing the sediments in the reservoir provide less probability that these can reach the turbines, causing damage and shortening their useful life. | en_US |
dc.format | application/pdf | en_US |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional Agraria La Molina | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Embalse Tablachaca | es_PE |
dc.subject | Volumen útil | es_PE |
dc.subject | Embalses | es_PE |
dc.subject | Cuencas hidrográficas | es_PE |
dc.subject | Almacenamiento de agua | es_PE |
dc.subject | Lluvia | es_PE |
dc.subject | Condiciones atmosféricas de predicción | es_PE |
dc.subject | Modelos matemáticos | es_PE |
dc.subject | Precipitación atmosférica | es_PE |
dc.title | Planeamiento del proceso de purga del embalse Tablachaca en base al pronóstico de lluvia realizado para el año 2018 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | en_US |
thesis.degree.discipline | Ingeniería Ambiental, Física y Meteorología | es_PE |
thesis.degree.grantor | Universidad Nacional Agraria La Molina. Facultad de Ciencias | es_PE |
thesis.degree.name | Ingeniero Meteorólogo | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#1.05.09 | es_PE |
renati.author.dni | 44530172 | es_PE |
dc.publisher.country | PE | es_PE |
dc.type.version | info:eu-repo/semantics/publishedVersion | en_US |
renati.advisor.orcid | https://orcid.org/0000-0002-9010-7500 | es_PE |
renati.advisor.dni | 09846638 | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 521035 | es_PE |
renati.juror | Arakaki Kiyán, Julio Alfonso | |
renati.juror | Calle Montes, Victoria Doris | |
renati.juror | Baldeón Quispe, Wilfredo Celestino |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
CIE-IA Tesis [315]