Mostrar el registro sencillo del ítem
Proceso constructivo de dique de concreto en la Qocha Chaccraccaqocha, distrito Carapo, provincia Huancasancos, región Ayacucho
dc.contributor.advisor | Aguilar Vidangos, Víctor Filiberto | |
dc.contributor.author | Valencia Chillcce, Eylín Marilia | |
dc.date.accessioned | 2024-02-13T15:25:18Z | |
dc.date.available | 2024-02-13T15:25:18Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12996/6265 | |
dc.description | Universidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícola. Departamento Académico de Ordenamiento Territorial y Construcción | es_PE |
dc.description.abstract | A pesar de que el Perú cuenta con una de las mayores reservas de agua del mundo, el cambio climático, la contaminación del recurso hídrico, la ineficiente gestión del agua y la insuficiente infraestructura hidráulica repercuten en su disponibilidad, siendo el sector agrícola uno de los más afectados. Por ello, el Ministerio de Desarrollo Agrario y Riego (MIDAGRI), por medio de la Unidad Ejecutora “Fondo Sierra Azul” (UEFSA), realiza esfuerzos para aumentar la seguridad hídrica agrícola a nivel de cuenca mediante intervenciones de Siembra y Cosecha de agua. En este sentido, la UEFSA aprobó el expediente técnico con Código Único de Inversión (CUI) N° 249766, con un presupuesto de S/. 141,025.78. Esta obra, ubicada en el distrito de Carapo, provincia de Huancasancos, región Ayacucho, se ejecutó en 45 días calendario, iniciando el 22 de septiembre y culminando el 5 de noviembre del 2021. Consistió en la construcción de un dique de concreto de 36.93 metros de longitud, con una altura de 2.18 metros y un ancho de corona de 0.30 metros, que permite un volumen de almacenamiento de 20,114.36 m3. Igualmente, se construyó un aliviadero, con una longitud de vertedero de 9.17 metros para un caudal máximo de 1.476 m3/s. Del mismo modo, se construyeron las estructuras de toma y descarga de agua, con una longitud de la tubería de descarga de 24 metros. El proceso constructivo se dividió en seis etapas: compatibilidad de obra, trabajos preliminares y provisionales, construcción de dique de concreto ciclópeo, construcción de estructura de toma y descarga, cierre de obra y taller de operación y mantenimiento. Durante el desarrollo del presente trabajo se detallan las etapas mencionadas, analizando y evaluando las particularidades y dificultades que se presentaron mientras se llevaba a cabo la obra. Asimismo, se consideran los protocolos de prevención y seguridad en el trabajo. | es_PE |
dc.description.abstract | Although Peru has one of the largest water reserves in the world, climate change, water resource pollution, inefficient water management and insufficient hydraulic infrastructure have an impact on water availability, being the agricultural sector one of the most affected. For this reason, the Ministry of Agrarian Development and Irrigation (MIDAGRI), through the implementer unit "Fondo Sierra Azul" (UEFSA), is striving to increase agricultural water security at the basin level through water planting and harvesting projects. In this sense, UEFSA approved the technical file with Unique Investment Code (CUI) N° 249766 with a budget of 141,025.78 Peruvian soles. This work -located in the district of Carapo, province of Huancasancos, Ayacucho region- was executed in 45 calendar days, starting on September 22 and ending on November 5, 2021. It consisted of the construction of a concrete dam 36.93 meters long, with a height of 2.18 meters and a crown width of 0.30 meters, which allows a storage volume of 20,114.36 m3. A spillway was also constructed, with a length of 9.17 meters for a maximum flow of 1,476 m3/s. Likewise, the water intake and discharge structures were built, with a discharge pipe length of 24 meters. The construction process was divided into six stages: site compatibility, preliminary and provisional works, construction of the cyclopean concrete dam, construction of the intake and discharge structure, site closure and operation and maintenance workshop. During the development of this work, the aforementioned stages are detailed, also analyzing and evaluating the particularities and difficulties that arose during the work execution. Likewise, the work prevention and safety protocols are considered. | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional Agraria La Molina | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | es_PE |
dc.subject | Dique | es_PE |
dc.title | Proceso constructivo de dique de concreto en la Qocha Chaccraccaqocha, distrito Carapo, provincia Huancasancos, región Ayacucho | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.discipline | Ingeniería Agrícola | es_PE |
thesis.degree.grantor | Universidad Nacional Agraria La Molina. Facultad de Ingeniería Agrícola | es_PE |
thesis.degree.name | Ingeniero Agrícola | es_PE |
dc.subject.ocde | pendiente | es_PE |
renati.author.dni | 48438923 | es_PE |
dc.publisher.country | PE | es_PE |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_PE |
renati.advisor.orcid | https://orcid.org/0000-0003-2317-4647 | es_PE |
renati.advisor.dni | 09877781 | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.discipline | 811096 | es_PE |
renati.juror | Velásquez Bejarano, Teresa Olinda | |
renati.juror | Galindez Oré, Armenio Flaubert | |
renati.juror | Orellana Pardave, Jose Antonio |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
IAG-OT Tesis [113]