Mostrar el registro sencillo del ítem
Interacción entre la presa de relaves y el acuífero de la microcuenca del río Yuracyacu
dc.contributor.advisor | Aguilar Giraldo, Guillermo Clemente | |
dc.contributor.author | Alva Huapaya, Carlos Alberto | |
dc.date.accessioned | 2021-01-13T22:43:12Z | |
dc.date.available | 2021-01-13T22:43:12Z | |
dc.date.issued | 2020 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12996/4551 | |
dc.description | Universidad Nacional Agraria La Molina. Escuela de Posgrado. Maestría en Recursos Hídricos | es_PE |
dc.description.abstract | El estudio se desarrolló en la margen derecha del río Yuracyacu ubicado en el distrito Parcoy, provincia de Pataz, departamento de La Libertad. Tiene como objetivo general, desarrollar el modelo de simulación del transporte de contaminantes de un depósito de relaves hacia las aguas subterráneas de la microcuenca Yuracyacu para implementar medidas de prevención y mitigación ambiental. En base a resultados de geología y geofísica, el acuífero es clasificado como libre, su espesor saturado es variable, su base es impermeable y el techo es permeable. La profundidad de la napa del acuífero en estudio varía entre 24.12 m (PI-04) y 38.80 m (PI-06). El sentido de flujo es de NorEste a SurOeste con 9.6% de gradiente hidráulico promedio. Las cargas hidráulicas están comprendidas entre 1982 msnm y 2061 msnm, observándose que el techo de la napa subterránea es uniforme desde la zona media en dirección Oeste, y con cierta anomalía en la zona Este. Las conductividades hidráulicas se hallan comprendidas entre 0.0008 m/día y 0.231 m/día. El software empleado para elaborar el modelo es el Visual ModFlow 2011.1, el que resuelve las ecuaciones de flujo haciendo uso del método numérico en diferencias finitas. Se ha simulado la probable ruta que seguirían los contaminantes una vez ocurrida algún tipo de contaminación en la relavera, para ello se han inyectado trazadores en la zona de presa y la simulación ha sido efectuada para 1825 días con periodos de avance del contaminante de 100 días. La simulación muestra que entre 500 días a 700 días aproximadamente serian detectados por los piezómetros PI-08 y PI-01, consecuentemente estos dos piezómetros son de vital de importante para el monitoreo de la calidad y el nivel de las aguas. Después de conocer la ruta del contaminante se procedió a desarrollar la variación temporal y espacial del transporte contaminante en caso sucediera algún evento de fuga de algún contaminante proveniente de la presa relavera, para ello, se ingresaron datos al software visual modflow para la simulación de 1825 días, utilizando el flujo en régimen transitorio. La simulación muestra que en los 150 días aproximadamente serian detectados por el pozo de observación OBS-1, a los 750 días en donde estaría llegando al pozo de observación OBS-2, y a los 1450 días en el pozo de observación OBS-3. El presupuesto referencial para la remediación de las aguas contaminadas es de S/. 1 425 790,71 Soles. | es_PE |
dc.description.abstract | The study was carried out on the right bank of the Yuracyacu River located in the Parcoy district, Pataz province, La Libertad department. Its general objective is to develop the simulation model of the transport of pollutants from a tailings deposit to the groundwater of the Yuracyacu micro-basin to implement environmental prevention and mitigation measures. Based on geological and geophysical results, the aquifer is classified as free, its saturated thickness is variable, its base is impermeable, and the roof is permeable. The depth of the aquifer under study varies between 24.12 m (PI-04) and 38.80 m (PI-06). The flow direction is from Northeast to Southwest with a 9.6% average hydraulic gradient. Hydraulic loads are between 1982 meters above sea level and 2061 meters above sea level, observing that the ceiling of the underground layer is uniform from the middle zone to the West, and with a certain anomaly in the East zone. The hydraulic conductivities are between 0.0008 m / day and 0.231 m / day. The software used to develop the model is Visual ModFlow 2011.1, which solves the flow equations using the numerical method in finite differences. The probable route that the contaminants would follow once some type of contamination occurred in the tailings dam has been simulated, for this, tracers have been injected into the dam area and the simulation has been carried out for 1825 days with periods of advance of the contaminant of 100 days . The simulation shows that between 500 days to 700 days approximately they would be detected by the PI-08 and PI-01 piezometers, consequently these two piezometers are vitally important for monitoring water quality and level. After knowing the route of the pollutant, we proceeded to develop the temporal and spatial variation of the pollutant transport in the event of a leakage event of a pollutant from the tailings dam, for this, data was entered into the visual modflow software for the simulation of 1825 days, using transient flow. The simulation shows that in approximately 150 days they would be detected by the observation well OBS-1, at 750 days where it would be arriving at the observation well OBS-2, and at 1450 days in the observation well OBS-3. The referential budget for the remediation of polluted waters is S /. 1 425 790.71 Soles. | en_US |
dc.format | application/pdf | en_US |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Nacional Agraria La Molina | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Aguas subterráneas | es_PE |
dc.subject | Recarga de aguas subterráneas | es_PE |
dc.subject | Modelos de simulación | es_PE |
dc.subject | Modelos matemáticos | es_PE |
dc.subject | Recursos hídricos | es_PE |
dc.subject | Aplicaciones del ordenador | es_PE |
dc.subject | Sistema acuífero | es_PE |
dc.subject | Represas | es_PE |
dc.subject | Microcuenca del Río Yuracyacu | es_PE |
dc.title | Interacción entre la presa de relaves y el acuífero de la microcuenca del río Yuracyacu | es_PE |
dc.type | info:eu-repo/semantics/masterThesis | en_US |
thesis.degree.discipline | Recursos Hídricos | es_PE |
thesis.degree.grantor | Universidad Nacional Agraria La Molina. Escuela de Posgrado | es_PE |
thesis.degree.name | Magister Scientiae - Ingeniería de Recursos Hídricos | es_PE |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#1.05.11 | es_PE |
renati.author.dni | 06672420 | es_PE |
dc.publisher.country | PE | es_PE |
dc.type.version | info:eu-repo/semantics/publishedVersion | en_US |
renati.advisor.orcid | https://orcid.org/0000-0001-5543-2618 | es_PE |
renati.advisor.dni | 06059903 | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_PE |
renati.discipline | 522197 | es_PE |
renati.juror | Sánchez Delgado, Miguel | |
renati.juror | Mejía Marcacuzco, Jesús Abel | |
renati.juror | Velásquez Bejarano, Teresa |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
M-RHI Tesis [61]